The new CSU Engineering II Building has 122,000 sqft. containing new classrooms and testing labs for the College of Engineering. JR Butler’s scope includes 32,000 sqft. of aluminum curtain wall, fire related curtain wall, storefront, and sunshades.
Slaterpaull
Haselden/Barton Malow Joint Venture
2013